Project
Construction project of an industrial plant in Tianjin
Test items
Pile integrity test of prestressed concrete pipe piles (pile diameter 400mm, pile length 19m)
Test overview
The project includes a total of 7 testing units, and the PIT reflected wave method tests a total of 210 piles. Among them, there are 182 prestressed pipe piles, the pile diameter is 400mm, and the pile length is 19 meters. They are formed by connecting the piles in two sections. The on-site testing data shows that the signal at the bottom of the pile is obvious, the position of the pile is good, and the pile body is complete.There are 28 bored cast-in-place piles with a diameter of 600mm and a length of 19 meters, 20 meters and 21 meters. The on-site testing data reflects the integrity of the piles
well.