Inquiry Cart
|
Login
|
Learn more
|
zhouwentao@whrsm.com
|
CHINESE
Home
Products
pile integrity testing
pile driving analyzer
sonic logging tester
static load tester
drilling monitor
pipe crawler
geophysical exploration
Case
Latest cases
Technology
Low Strain PIT Test
High Strain PDA Test
Ultrasonic Cross Hole Sonic Logging Test
Static Load Test
Parallel Seismic Test
Ultrasonic Hole Quality Test
Road and Bridge Test
Geophysical Exploration series
Non-contact Optical Measurement
Reinforcement Length test
Pipe Inspection
Download
Users manual
Report sample
Testing data for demo
Analysis Software
VIDEO
Operation instruction video
Software instruction video
Product introduction video
RSM Series Classroom
About us
Contact us
About Sinorock
Certifications
Sinorock Service
News
Company News
Industry News
Case Category
Case
Latest cases
Technology
Home
>
Case
>
Latest cases
on Site Case Analysis of CSL Testing of Pile Foundation Integrity
on Site Case Analysis of CSL Testing of Pile Foundation Integrity
Description
Case1
Acoustic tube oblique or bent.
Case2
Pile body segregation
The pile is 36 meters long and the pile body is separated.
Case3
The pile length is 54 meters, and the pile bottom sediment.
Case4
The pile is 45 meters long, 2-4 meters from the top of the pile, the hole wall collapses to form a mud mass.
Case5
The pile is 46 meters long, with 24-25 meters segregated under the top of the pile.
Case6
The pile is 68 meters long, and it is separated at 12-13 meters below the top of the pile.
Case7
The pile is 44 meters long, and the vertical sediment is 3 meters below the pile top.
Case8
The pile is 72 meters long, with 3.5-4.5 meters of faulted sediment under the pile top.
Tom Zhou
Tom Zhou
Tom Zhou
Tom Zhou