Case1
Acoustic tube oblique or bent.
Case2
Pile body segregation
The pile is 36 meters long and the pile body is separated.


Case3
The pile length is 54 meters, and the pile bottom sediment.

Case4
The pile is 45 meters long, 2-4 meters from the top of the pile, the hole wall collapses to form a mud mass.

Case5
The pile is 46 meters long, with 24-25 meters segregated under the top of the pile.

Case6
The pile is 68 meters long, and it is separated at 12-13 meters below the top of the pile.

Case7
The pile is 44 meters long, and the vertical sediment is 3 meters below the pile top.

Case8
The pile is 72 meters long, with 3.5-4.5 meters of faulted sediment under the pile top.