Baihetan-Zhejiang ±800kV UHV DC Transmission Line Project

Ultrasonic cross hole sonic logging of foundation piles (pile length: 32 meters, pile diameter: 1.5 meters)
Description
 Project  
Baihetan-Zhejiang ±800kV UHV DC Transmission Line Project

 Test items 
Ultrasonic cross hole sonic logging of foundation piles (pile length: 32 meters, pile diameter: 1.5 meters)
 

 Test overview 
The ±800kV UHV DC transmission line project is a major project of the State Grid.The owner requires each construction unit to perform 100% self-test of the integrity of the foundation piles. Anhui Shunkai Testing Technology Co., Ltd., as a power inspection unit under Anhui Power Grid, assists the project department in completing the self-test of this project.
 