Case Category

Pipeline Inspection and Evaluation Result Table

Pipeline Inspection and Evaluation Result Table
Description
 
Video File 20181217-125732-PipelineRobotVideo-[YaSuo].avi Initial Well No. NY2 Ending Well No. NY3
Laying Date 2018-04-27
April 27, 2018
Burial Depth of Starting Point 2.5m Burial Depth of End Point 2.5m
Pipeline Type Sewage pipeline   Pipeline Material GH reinforced concrete pipe Pipeline Diameter 1200mm
Inspection Direction Downstream Pipeline Length 100.00m Inspection Length 100.00m
Rehabilitation Index 8.00 Maintenance Index    Inspector FH
Inspection Location Tianxiang Shangfu 4 Inspection Date December 17, 2018
Distance (m) Defect Name and Code Score Level Description of Internal Condition of Pipeline Picture
2.41m (BX) Deformation 1.0 1 Structural defect, the position of circumferential 0000, longitudinal length of 0.00m 1
/ / / / / /
Remarks /
   
Picture 1  
 
 
Video File 20181217-113733-PipelineRobotVideo-[YaSuo].avi Initial Well No. NY2 Ending Well No. NY3
Laying Date  
April 27, 2018
Burial Depth of Starting Point 2.5m Burial Depth of End Point 2.5m
Pipeline Type Sewage pipeline Pipeline Material GH reinforced concrete pipe Pipeline Diameter 1200mm
Inspection Direction Downstream Pipeline Length 100.00m Inspection Length 100.00m
Rehabilitation Index 8.00 Maintenance Index    Inspector FH
Inspection Location Tianxiang Shangfu 3 Inspection Date December 17, 2018
Distance (m) Defect Name and Code Score Level Description of Internal Condition of Pipeline Picture
12.41m (CJ) Deposition 0.5 1 Functional defect, the position of circumferential 0000, longitudinal length of 0.00m 1
/ / / / / /
Remarks /
   
 
Picture 1